RENEWAL OF INFRASTRUCTURES AND TECHNICAL EQUIPMENT OF THE B3 STUDIO OF TORRESPAÑA / MADRID

RENEWAL OF INFRASTRUCTURES AND TECHNICAL EQUIPMENT OF THE B3 STUDIO OF TORRESPAÑA / MADRID

VAV Engineering is awarded the contract for the engineering, installation and start-up of new equipment for the adaptation of the Torrespaña B3 Studio that will allow workflows in High Definition.

The execution of the installation works will be divided into two phases, taking into account that infrastructure works have to be carried out in the spaces that affect the installation, for their adaptation to the new operating environments for the development of the installation and assembly of the new equipment

In a first phase, VAV Engineering has already started to dismantle and disaffect the current equipment and it has become obsolete with the arrival of new HD technologies. After the completion of this preliminary phase, civil works will be undertaken to adapt the work environments to the new operating requirements. Once these conditioning work has been completed, the installation of the new wiring infrastructure, the new equipment purchased and the integration and final commissioning of Studio B3 and all associated areas will begin.

Among the areas and workspaces that will be affected by the renovation and installation of equipment, and its corresponding wiring, are the following environments: Master Control Room, Controls of Studio B3, Studio Floor B3 and the Press Room.